How to use this estimate
- Use the range to screen bids, not to set a contractor’s price.
- Ask every bidder to separate equipment, labor, controls, permits, and ductwork.
- A load calculation and commissioning plan matter more than matching the current equipment size.
Transparent method
We expose the planning formula so you can challenge it and replace assumptions with local evidence.
equipment baseline × capacity × tier + labor complexity + duct allowance + permits/electricalWhat this calculator cannot see
- Regional labor, rebates, brand pricing, refrigerant transitions, structural work, and electrical service upgrades can move a real quote outside the range.
- This tool does not replace ACCA Manual J/S/D design or a site inspection.
Professional verification
Use this result to prepare questions and compare scenarios. Final equipment selection, electrical work, refrigerant work, combustion, duct design, and permitting should be handled by qualified professionals following local codes and manufacturer instructions.